SST Iron-on Velcro Kit for Head Guard Installation

$6.95

Use this custom Iron-on Velcro Kit to install an SST Head Guard Set in up to two (2) hats.

Velcro Kits are included with all SST Head Guard Set or Single Guard purchases. If your player gets new hats at the start of a season, a new Velcro Kit will be required.

Installation takes about 5 minutes and prevents the SST Head Guards from moving.

Click HERE to view and print the instructions for installing the Iron-on Velcro Kit inside a hat.

In stock

Description

1. Each SST Head Guard Comes with a custom Velcro Kit that provides secure installation inside the hat, preventing guard movement during use. Each Kit includes:

(1) 1″ x 3″ Iron-on Loop Patch

(1) .5″ x 3″ Peel and Stick Hook Strip

2. Make sure your SST Head Guard(s) are clean and dry. Peel the backing from the 3″ x .5″ Velcro strip and place along the bottom outer edge of the guard where the SST logo is.

3. The placement for the 1″ x 1.5″ Iron-on Loop Patch can vary based on the type of guard you purchased. Just be sure to place the Loop Patch inside the hat where it will meet the Hook Strip on the guard. You may use one or both patches included with each guard. Installing both patches included with each SST Guard will provide the most secure installation but one patch works as well.

4. Turn your iron to highest heat setting recommended for the type of fabric the hat is made with and activate the steam option.

  • Make sure the Loop Patch is placed where you want it inside the hat liner and that it faces where it will meet the Hook Strip.

  • Use a cotton cloth or similar piece of fabric to cover your hat. This will help protect the hat from being damaged by the iron.

  • With the Loop Patch and protective cloth covering the outside of the hat, place the iron on top of the protective cloth and Loop Patch. Use firm pressure and move the iron slightly back and forth for 60-90 seconds.

  • Allow the hat to cool for a few minutes and then check that the Loop Patch has been securely bonded with the hat.

  • If any part of the Loop Patch, especially the corners, is not attached to the hat, apply the iron for an additional 30-60 seconds.

  • Repeat the process for all desired Loop Patches.

  • Your hat is now ready for secure SST Head Guard installation.

Share your thoughts!

Let us know what you think...

What others are saying

There are no contributions yet.

×

Login

Register

Continue as a Guest

Don't have an account? Sign Up